Calculate total man-hours, estimate how long a job will take or find the crew size you need to meet a deadline.

Updated September 11, 2026 · No signup required

Plan your crew’s time

One man-hour is one person working for one hour. Start with the sample or enter your own schedule.

Job & crew details
Allow for breaks & non-job time

Leave both at 0 if the hours entered already represent hands-on job time. For partial days, these daily allowances are prorated.

Optional: estimate job labor cost

Use the labor cost calculator to find a loaded cost per worked employee-hour. Do not use its productive-hour rate here if you also enter non-job time.

How to calculate man-hours

Multiply the number of people by the hours each person works, then by the number of working days. For a crew on the same schedule:

Man-hours = people × worked hours per day × working days

The calculator subtracts entered breaks from shift hours. It then separates non-job work, such as travel and setup, from productive time available for the job. Enter each deduction only once.

Example: a three-person landscaping crew

Three people working eight hours a day for two days provide 48 man-hours. The job spans 16 elapsed crew-hours, because the three people work at the same time. At a loaded cost of $35 per worked person-hour, the labor budget is $1,680.

If each person instead takes a 30-minute break and spends one hour on non-job work per day, the same schedule has 45 worked person-hours and 39 productive job man-hours. A job requiring 48 productive man-hours would need more time.

Estimate job duration or crew size

How long will the job take?

Divide productive man-hours required by the crew’s daily productive hours. A 48-man-hour job with three people working eight productive hours per day takes two working days.

How many people do you need?

Divide productive man-hours required by productive hours per person per day and available working days. Round up to a whole person to meet the deadline.

What changes on a real job?

Equipment limits, task order, access, weather and crew experience can prevent work from being shared evenly. Use the result as a starting estimate and check it against similar completed jobs.

Same 48-man-hour job, different crew sizes · 8 productive hours per person per day
PeopleElapsed crew-hoursWorking daysTotal man-hours
224348
316248
4121.548

Man-hour pricing calculator

Need to decide what to charge per billable person-hour? Use your annual team costs and billable hours below. This is a separate business-pricing calculation; it does not change the crew estimate above.

Calculate your cost and selling price per man-hour

Your hourly pricing estimate

Target price / person-hour$104.15
Break-even cost / person-hour$88.53
Annual billable person-hours5,700
Labor cost / billable hour$55.89
Overhead / billable hour$32.63
Target rate minus current rate$19.15

A positive rate difference means the target is above your current price. This estimate includes only the costs entered; add materials or other excluded job costs separately.

Target price = (annual labor + overhead) ÷ billable hours ÷ (1 − target margin). For example, an $80 hourly cost needs a $100 selling price to leave a 20% margin. Adding 20% to $80 gives $96—a markup, not a 20% margin.

Man-hour calculator questions

Are man-hours and person-hours the same?

Yes. Both describe one person working for one hour. Labor-hours and worker-hours are also commonly used for the same unit.

Are man-hours the same as crew-hours?

No. One elapsed hour for a three-person crew is three man-hours. Keep those units separate when estimating costs or comparing a quote with actual time.

How do I enter hours and minutes?

Use decimal hours for the shift: 30 minutes is 0.5 hours, so 7 hours 30 minutes is 7.5. Breaks and non-job time have separate fields entered in minutes.

What if people work different hours?

Calculate each group with the same schedule separately and add their man-hours. For example, two people working six hours plus one person working four hours equals 16 man-hours.

Does adding workers always shorten the job?

Only when the work can be divided without reducing productivity. A single machine, curing time or tasks that must happen in sequence may limit how much a larger crew can help.

Does this calculate payroll or overtime?

No. This is a crew-planning and estimating tool. It does not decide which breaks are paid, apply overtime rules or replace payroll records. The optional job-cost estimate applies one rate to all worked hours entered.